A concrete floor slab was inspected and assessed for the openings created to allow for pipes. The concrete slab was strengthened with fiber reinforced strips along the openings. Steel plates were introduced to bottom flange of steel beam to strengthen the beam for additional operating load.The critical stages of the process were visually inspected and verified for appropriate certification of the works.