Gymea Bay Bridge Load Assesment

Neilly Davies was tasked with completing site inspections and a subsequent load assessment by Southerland Shire Council to determine the capability of withstanding the new proposed loading to the streetscape and underneath the bridge. Upon the load assessment of the bridge, based off the existing structural drawings that were provided by council, Neilly Davies determined that the rail bridge would be able to withstand the new loading and was subsequently carried out for completion.

Client Sutherland Shire Council
Project Value
Scroll to Top